Your screen. Your subscription. Your ProMax. Start with a one-day trial ↗

Pro Max 4K OTT

Reading ordered DASH UTCTiming alternatives

A DASH UTCTiming element identifies a clock-synchronization mechanism.

Your first setup message. Name the device model, operating system and player edition. Pro Max 4K OTT, promax4k.tv.
Your first setup message. Name the device model, operating system and player edition. Pro Max 4K OTT, promax4k.tv.

A DASH UTCTiming element identifies a clock-synchronization mechanism. Under the DASH-IF restricted timing guidelines, several listed elements form an order of preference. A client’s ability to use the selected mechanism matters separately from whether the device displays the expected local hour. Preserve the mechanism identifiers when investigating a live timing failure.

Inspect the list rather than one URL

Imagine an MPD listing two supported synchronization alternatives in preference order. A client may need to examine the defined mechanisms according to that model; the presence of a second entry is not itself an accidental duplicate. A diagnostic that retains only the first value can lose useful context about the alternatives the publisher actually offered.

Keep the implementation model explicit

The cited guidelines restrict mechanisms to specific HTTP-based and direct schemes and require warnings or errors to developers when synchronization cannot be performed, no timing element exists, or none of the referenced mechanisms is supported. These are requirements of that interoperability model. They do not establish that every application claiming general DASH support implements the same subset or exposes the same viewer-facing error.

Do not hide an integration failure with a default

The guidelines disallow an unlisted default time source unless the application developer explicitly instructs its use, because silent defaults can obscure interoperability problems. For a focused test, retain the advertised mechanisms, selected mechanism and actual synchronization outcome. A clock that happens to look correct in the television menu does not establish that the client completed the presentation’s stated synchronization exchange.

Record the result the operator can inspect

A viewer can report the programme, app build and timing symptom; a developer can add the synchronization warning and redacted mechanism information. Separate an unsupported mechanism from a reachable mechanism returning an unusable result. This narrows the correction to the actual client-source integration. It does not require changing the viewer’s timezone, account country or spoken language, and it does not establish a particular clock error merely because live playback failed before the first picture.

Sources & further reading

An evening worth making time for

Get the player ready.
We’ll help with the rest.

Install the player for your screen, then WhatsApp the ProMax team for a one-day free trial. Already watching? Open the help desk for your next step.

Ask ProMax↑